Explore
- Securing the footings and making sure they are level.
- Main profile erected and established.
- Close-up of profile's footing.
- Outer floor joist support connected.
- Close-up of the upper profile's connection.
- Close-up of the floor joist connection.
- Another look at the floor joist and its interlocking patented system for extra support.
- Interior floor supports are installed.
- Roof beams connected
- Another angle of the recently added roof pitch.
- With roof shield installed, the roof is put in place.
- The roof in the process of installation.
- With the roof half way installed, the Sanctuary starts to take shape.
- Another angle of the almost completed construction.